[a / b / c / d / e / f / g / gif / h / hr / k / m / o / p / s / t / u / v / vg / vm / vmg / vr / vrpg / vst / w / wg] [i / ic] [r9k / s4s / vip] [cm / hm / lgbt / y] [3 / aco / adv / an / bant / biz / cgl / ck / co / diy / fa / fit / gd / hc / his / int / jp / lit / mlp / mu / n / news / out / po / pol / pw / qst / sci / soc / sp / tg / toy / trv / tv / vp / vt / wsg / wsr / x / xs] [Settings] [Search] [Mobile] [Home]
Board
▼ Settings Mobile Home
4chan
/diy/ - Do It Yourself

Name
Options
Comment
Options


Gimmicks


PEE text
My Bans
Verification
File

    08/21/20New boards added: /vrpg/, /vmg/, /vst/ and /vm/
    05/04/17New trial board added: /bant/ - International/Random
    10/04/16New board for 4chan Pass users: /vip/ - Very Important Posts
    [Hide] [Show All]




    File: kendall-gray.gif (450 KB, 220x220)
    450 KB GIF
    You should charge 2.5×–3× direct equipment cost to cover your fuel, transport to/from the site, insurance, depreciation, permits, and your own labor.

    >Utility Trenching (water, sewer, electrical)
    >$15–$40/linear ft
    Machine trenching with backfill. $500 minimum is common. Rocky or deep work pushes it higher.

    >Foundation Excavation (slab-on-grade or crawl space) $3,000–>$12,000
    Includes digging, grading, and stockpiling soil. Slab work on the low end; full basement dig $12K–$20K.

    >Dirt/Debris Hauling (dump truck) $150–$400/load (delivery) or >$1,400–$2,300/truckload (removal)
    Removal (hauling off) costs more than delivery due to dump fees at the landfill. 10–16 yd3 per load.

    >Site Clearing & Grubbing
    >$1,000–$5,000+
    Depends on acreage and vegetation density. Often quoted per acre or as a flat project bid.

    >Small Demolition (sheds, concrete slabs, fences)
    $1,000–$10,000+
    A slab break with loader/hammer and haul-off easily hits $3K–$8K. Small structures on the low end.

    >Driveway Grading / Earthwork
    >$2,000–$8,000
    Cut/fill, compaction, and final grade. More material movement = higher end.

    >Septic Tank Dig / Replacement
    >$1,500–$4,000
    Excavation, tank placement, and backfill. Add $1K–$2K if you're also hauling the old tank.

    >Small Crane Lift (materials, trees, equipment)
    >$500–$2,000/day (minimum)
    Small mobile crane or boom truck. Most operators charge a half-day or full-day minimum even for a quick lift.

    >Gravel Delivery & Spreading
    <$500–$1,500/load
    10-yd3 load with delivery and spreading. Bulk orders (20+ yd3) drop the per-yard rate.

    >Swimming Pool Excavation
    >$5,000–$15,000
    Dig, shape, and haul off. Includes form work for gunite pools. Gunite itself is separate.
    >>
    File: money-printer.gif (2.41 MB, 560x640)
    2.41 MB GIF
    Top paying gigs:

    >Crane work (mobile/tower)
    NCCCO cert, high liability, few qualified operators $800–$2,000+/day; tower crane $1,200–$2,500/day

    >Utility trenching (water/sewer/gas)
    Permit-driven, can't be DIY'd, recurring demand $15–$40/ft; $2K–$10K per project

    >Refinery/industrial shutdowns
    3–6 week stints, OT-heavy, remote locations $55–$88/hr (CA prevailing wage); $75K–$120K+ per stint

    >Foundation excavation + basement digs
    High ticket, one job = weeks of income $8K–$20K per basement

    >GPS-guided excavation / machine control
    Premium skill, fewer operators can do it $35–$42/hr equivalent; $500–$900/day as a sole prop

    >Directional drilling (horizontal boring)
    25–40% pay boost over standard digging, niche $100–$300/ft for small bores

    >Septic installation (dig + set + backfill) Recurring, residential cash flow, low competition in rural areas $3K–$6K per system

    >Demolition + haul-off (combined)
    You control both ends of the job, no subcontractor margin $5K–$25K per structure

    >Land clearing for solar/wind farms
    Multi-month contracts, bulk material movement $1,500–$4,000/acre

    >Pile driving / foundation support
    Specialized equipment, high barrier to entry $100–$300/ft per pile

    The #1 money multiplier is going from "I'll dig your hole for $500" to "I'll handle the full utility connection, trenching, backfill, and compaction for $8,000." Same truck, same day, 16× the check.
    >>
    how much do (you) get per emdash?
    >>
    >>3009761
    >–
    gm sir thank you for doing the AI needful and reverting back with the same
    >>
    >>3009768
    Based NEET. I also spend my neetbux of gunz, ammo, crafts and festivals.
    BTC
    bc1qtm4rep7kyp2p28hlkfktpnd0j7uew47vnt2mev
    LTC
    ltc1q9xlaysse0mpfwf025esd69kt9zu3md22gh23du
    ETH
    0x6abA18D203520c8F90ca63eE7426a7bC345D98e6
    SOL
    E5ekoiauCR8yiNp451dmuPzhUxo84P5x3m9WJBK5kxZe
    XRP
    r3jYXNdMk2Vz5hXhKCKE9re8uz93JQFG1r
    DOGE
    DSBq5jRWkiwmEh1G7zBwmQDgRkvRr61fmb
    XMR
    85CTwq5wGjWZw5GgzgwZPrHyZxpLXMK5oZSSSk5j4x9w1bpqzisaWAUZYaAPfh6rP2MZJcaFqF1XmEzkw6YCqJSS2Txu6Z8




    Delete Post: [File Only] Style:
    [Disable Mobile View / Use Desktop Site]

    [Enable Mobile View / Use Mobile Site]

    All trademarks and copyrights on this page are owned by their respective parties. Images uploaded are the responsibility of the Poster. Comments are owned by the Poster.